HiredNow AI
Association of Village Council Presidents

Typhoon Halong Lead Carpenter

  • Bethel, AK

Found by HiredNow AI on Oct 27, 2025. Subscribers saw it first.

About the role

Description

SUMMARY

: Lead carpenters must be able to lead a crew of 3 to 4 people. Remote Alaska residential remodeling experiences a plus.

PERFORMANCE RESPONSIBILITIES

include the following. Other duties may be assigned:

  • Study individual job sites, plan work and accurately take off construction material
  • Estimate amount of work and time required for job
  • Experience building foundations and leveling buildings.
  • Experience with all phases of residential construction. Installation of windows, doors, Insulation, sealing, flooring siding and roof work. Able to lay out and build stairs. Finish carpentry. Setting cabinets and counter tops. General understanding of electrical and plumbing.
  • Manage materials and supplies as necessary to facilitate the efficient progression of work on the job.
  • Understand construction logistics in Rural Alaska.
  • Prepare project labor coding on timesheets
  • Work with Human Resources Department, Transportation Director to hire supervisor, discipline, and if n necessary fire onsite employees.
  • Interact with the general public maintaining a professional attitude and working relationship.
  • Travels frequently within the region for projects.

Requirements

QUALIFICATIONS

  • To perform this job successfully, an individual must be able to perform each essential duty satisfactorily. The requirements listed below are representative of the knowledge, skill, and/or ability required. Reasonable accommodations may be made to enable individuals with disabilities to perform the essential functions. Fluency in Yup’ik and English is strongly preferred. Work will be in outdoor environments. May travel by jet, small plane, four wheeler, snow machine, boat.
  • REQUIREMENTS: Supervisory Experience
  • Proof (evidence) of construction supervisory experience – minimum 4 years experience.
  • Provide resume of previous employment with references
  • Show proficiency with residential construction

EDUCATION and EXPERIENCE

Must have a High school diploma or GED. Four (4) years working in a carpenter position. Apprenticeship trade in construction or maintenance is strongly preferred. Must have experience in and knowledge of Personal Protective Equipment (PPE) and use it.

Certificates, Licenses, Registrations: Valid State of Alaska Driver’s License with a good enough driving record to be insured on the AVCP Vehicle Policy.

Apply at Association of Village Council Presidents